OptimonCoreSync Studio
IE
Acting asAuthorization is evaluated by effect, not by screen. Demonstration only.0 session operations
MV-VIEW-05

Trigger and capture-group workbench

within /coresync/design/flows · Vision engineer

Expected camera set, trigger/encoder correlation, epoch, timing tolerance and missing views.

Guardrail · Trigger/strobe configuration changes require scoped approval; no industrial reject or motion control.

Synthetic vision workspace. No camera, frame grabber or vision controller has been contacted; camera SDKs run only in engineering-managed edge workers, never in a browser. No real image exists here — every frame is a described placeholder. Nothing is live or qualified, and no inspection result releases product or causes any robot, reject, dispatch or stock effect.

Capture groups (26)

MV-CG-001 — Billet B-2291 head face

PASS_CANDIDATE
Station MV-STN-001
Trigger source hardware_trigger
Deadline 1500 ms
Epoch 1
Recipe MV-RCP-001 valid
Completeness complete

Completeness is a semantic check across the required views of one subject in one epoch. A frame count never establishes it, and sequences are never compared across epochs.

Views in this group

ViewRequiredPresentSource sequenceEpochCapture timeReceived timeLatenessDigest
VIEW-Ayespresent100012026-09-01T07:00:49.000Z2026-09-01T07:01:49.000Z15ssha256:syn000000
VIEW-Byespresent100112026-09-01T07:02:49.000Z2026-09-01T07:03:49.000Z20ssha256:syn000001

Capture time and received time are held apart and never collapsed. Late data is preserved as late; it is not back-dated into the group.

Where this group leads