CS-SYN-003 · SYN Governed synchronization and action-boundary transport · 187 of 192
Bind an authorized intent to a target operation
Action Integration Engineer · Trigger: An approved workflow needs a target-specific operation.
Simulated fixture data. Every record, receipt and timeline entry on this screen is demonstration material. It is never production evidence.
Acceptance
0 of 3 steps satisfiedBinding tests will validate target schema and keep simulation separate from execution.
Run the remaining steps below. The result is read back from record state — nothing here is a toast.
Normal path
An outbound action is permitted, staged under dual control and evidenced by a receipt — permit, transport and outcome kept apart.
Step 1. Record the synchronization permit. A permit is not a transport.
not yet satisfiedpermitpendingsynchronizationdriftedcommandEvidencequeued
Separation of duties: Integration Engineer may not do this. Act as
Acceptance for this step: permit = granted
Step 2. Stage the command under dual control.
not yet satisfiedpermitgrantedsynchronizationcurrentcommandEvidenceaccepted
Separation of duties: Integration Engineer may not do this. Act as
Acceptance for this step: commandEvidence = queued
Step 3. Verify the receipt chain; a receipt is not a real-world outcome.
not yet satisfiedOperates onEVID-008Asset/PackLine-3 · energy evidence 8Evidence chain· NORTHBRIDGE-ALLOY / Sheffield Bar Mill
custodyunknowncompletenessmissingmaturityconformant
Moves the record and writes evidence. Permission: annotate.
Acceptance for this step: custody = verified
Exception path
A mapping preview will not dispatch a live operation.
Alternate path. Authority is withdrawn: revoke the permit and hold every staged command.
not yet satisfiedpermitpendingsynchronizationdriftedcommandEvidencequeued
Separation of duties: Integration Engineer may not do this. Act as
Acceptance for this step: permit = revoked, synchronization = blocked
Workflow as specified
CoreSync will register a versioned command binding with target identity, operation schema, preconditions and receipt expectations, without granting authority to execute it.
Evidence written in this session
Nothing run yet in this session. Record state shown above may already satisfy steps from the seeded fixture history.
Journeys that include it
Not part of a composite journey; exercised through its family views.
