OptimonCoreSync Studio
IE
CS-SYN-002 · SYN Governed synchronization and action-boundary transport · 186 of 192

Reconcile conflicting synchronization states

Data Steward · Trigger: Source and target report incompatible effective states.

Simulated fixture data. Every record, receipt and timeline entry on this screen is demonstration material. It is never production evidence.

Acceptance

2 of 3 steps satisfied

The final state will retain the chosen rule, rejected alternatives and unresolved uncertainty.

Run the remaining steps below. The result is read back from record state — nothing here is a toast.

Normal path

An outbound action is permitted, staged under dual control and evidenced by a receipt — permit, transport and outcome kept apart.
Step 1. Record the synchronization permit. A permit is not a transport.
satisfied
Operates onSYNC-021CMMS work order sync 21Sync target· OPTIMON-IND / Raigarh Melt Shop
permitgrantedsynchronizationcurrentcommandEvidenceaccepted
Separation of duties: Integration Engineer may not do this. Act as
Acceptance for this step: permit = granted
Step 2. Stage the command under dual control.
not yet satisfied
Operates onSYNC-028Label printer command 28Sync target· NORTHBRIDGE-ALLOY / Sheffield Bar Mill
permitgrantedsynchronizationblockedcommandEvidenceaccepted
Separation of duties: Integration Engineer may not do this. Act as
Acceptance for this step: commandEvidence = queued
Step 3. Verify the receipt chain; a receipt is not a real-world outcome.
satisfied
Operates onEVID-007Asset/Bale · mass evidence 7Evidence chain· OPTIMON-IND / Halol Packaging Line
custodyverifiedcompletenesscompletematurityproposed
Moves the record and writes evidence. Permission: annotate.
Acceptance for this step: custody = verified

Exception path

Arrival order will not silently decide which business state is authoritative.
Alternate path. Authority is withdrawn: revoke the permit and hold every staged command.
not yet satisfied
Operates onSYNC-021CMMS work order sync 21Sync target· OPTIMON-IND / Raigarh Melt Shop
permitgrantedsynchronizationcurrentcommandEvidenceaccepted
Separation of duties: Integration Engineer may not do this. Act as
Acceptance for this step: permit = revoked, synchronization = blocked

Workflow as specified

CoreSync will compare versions, authority, source history and delivery evidence, then apply an approved conflict rule or open a resolution case.

Evidence written in this session

Nothing run yet in this session. Record state shown above may already satisfy steps from the seeded fixture history.

Journeys that include it

Not part of a composite journey; exercised through its family views.