CS-OT-007 · OT Industrial telemetry and equipment acquisition · 31 of 192
Receive cycle-triggered and synchronized groups
OT Integration Engineer · Trigger: Several readings belong to one machine cycle or coordinated capture.
Simulated fixture data. Every record, receipt and timeline entry on this screen is demonstration material. It is never production evidence.
Acceptance
2 of 4 steps satisfiedA missing member or excessive clock uncertainty will prevent an unsupported complete-group claim.
Run the remaining steps below. The result is read back from record state — nothing here is a toast.
Normal path
Equipment telemetry is acquired by a deployed flow on a healthy runtime, with the run ledger inspected.
Step 1. Validate the flow definition including its recovery contract.
satisfiedOperates onFLOW-023HAL Application API E23 → canonical flowFlow definition· OPTIMON-IND / Halol Packaging Line
definitionapproveddeploymentreleasedruntimeHealthhealthy
Moves the record and writes evidence. Permission: test.
Acceptance for this step: definition = approved
Step 2. Confirm the runtime that will execute it is reachable.
not yet satisfiedconnectivitydegradedtrusttrusteddriftdrifted
Moves the record and writes evidence. Permission: test.
Acceptance for this step: connectivity = healthy
Step 3. Deploy the flow to its placement.
not yet satisfiedOperates onFLOW-009RGH Mobile capture C9 → canonical flowFlow definition· OPTIMON-IND / Raigarh Melt Shop
definitionapproveddeploymentplannedruntimeHealthfailed
Separation of duties: Integration Engineer may not do this. Act as
Acceptance for this step: deployment = released
Step 4. Inspect the run: admitted, published and receipts compared.
satisfiedOperates onRUN-036SHF Vision system B8 → canonical flow · run 20260935Flow run· NORTHBRIDGE-ALLOY / Sheffield Bar Mill
executionsucceededadmissioncompletedeliveryaccepted
Moves the record and writes evidence. Permission: annotate.
Acceptance for this step: evidence entry written
Exception path
Simultaneous arrival alone will not prove synchronization.
Alternate path. Acquisition stalls: raise and assign the incident against the failing stage.
not yet satisfiedOperates onINCI-023Certificate expiry — Raigarh Melt ShopIncident· OPTIMON-IND / Halol Packaging Line
triagependingimpactdegradedremediationblocked
Moves the record and writes evidence. Permission: remediate.
Acceptance for this step: triage = in review
Workflow as specified
CoreSync will retain cycle and group identifiers, clock-quality evidence and declared completeness rules, publishing complete or explicitly incomplete groups according to contract.
Evidence written in this session
Nothing run yet in this session. Record state shown above may already satisfy steps from the seeded fixture history.
Journeys that include it
Not part of a composite journey; exercised through its family views.
