CS-OBS-007 · OBS Operations, lineage, data readiness and consumption · 161 of 192
Plan capacity and attribute integration cost
Platform Operator · Trigger: Workload grows or resource usage needs explanation.
Simulated fixture data. Every record, receipt and timeline entry on this screen is demonstration material. It is never production evidence.
Acceptance
3 of 4 steps satisfiedReports will reconcile to measured usage and identify assumptions, pressure points and unallocated items.
Run the remaining steps below. The result is read back from record state — nothing here is a toast.
Normal path
A failure is seen at the failing stage, owned, remediated and closed with evidence.
Step 1. Inspect the run and identify the failing stage.
satisfiedOperates onRUN-021RGH OT controller C21 → canonical flow · run 20260920Flow run· OPTIMON-IND / Raigarh Melt Shop
executionsucceededadmissioncompletedeliveryaccepted
Moves the record and writes evidence. Permission: annotate.
Acceptance for this step: evidence entry written
Step 2. Assign the incident to an owner with its runbook.
not yet satisfiedtriageresolvedimpactdegradedremediationcomplete
Moves the record and writes evidence. Permission: remediate.
Acceptance for this step: triage = in review
Step 3. Execute the permitted remediation.
satisfiedtriageresolvedimpactdegradedremediationcomplete
Moves the record and writes evidence. Permission: remediate.
Acceptance for this step: remediation = complete, triage = resolved
Step 4. Close the run with reconciliation evidence.
satisfiedOperates onRUN-021RGH OT controller C21 → canonical flow · run 20260920Flow run· OPTIMON-IND / Raigarh Melt Shop
executionsucceededadmissioncompletedeliveryaccepted
Separation of duties: Integration Engineer may not do this. Act as
Acceptance for this step: execution = succeeded
Exception path
Costs or recovery horizons will not be presented as precise when their inputs are incomplete.
Alternate path. Remediation is not permitted at this level: escalate to the release manager.
not yet satisfiedtriageresolvedimpactdegradedremediationcomplete
Moves the record and writes evidence. Permission: annotate.
Acceptance for this step: impact = blocked
Workflow as specified
CoreSync will attribute transport, compute, queue storage, evidence storage and egress by tenant/source/flow and compare measured demand with declared capacity assumptions.
Evidence written in this session
Nothing run yet in this session. Record state shown above may already satisfy steps from the seeded fixture history.
Journeys that include it
Not part of a composite journey; exercised through its family views.
Views where it lives
Acquisition Operations · Operational overviewAcquisition Operations · Incidents and runbooksAcquisition Operations · Lineage and evidence explorerAcquisition Operations · Use-case data readinessDesign · Policy and locality editorDelivery · Published data and subscription catalogueGovernance · Usage, entitlements and capacity
