OptimonCoreSync Studio
IE
CS-DQ-002 · DQ Quality validation, drift and remediation · 122 of 192

Retain valid off-spec process observations

Quality Data Engineer · Trigger: A measurement exceeds an operational specification.

Simulated fixture data. Every record, receipt and timeline entry on this screen is demonstration material. It is never production evidence.

Acceptance

0 of 3 steps satisfied

An off-spec but valid measurement will remain available while malformed or unusable data follows its contract.

Run the remaining steps below. The result is read back from record state — nothing here is a toast.

Normal path

A quality failure is held, corrected under authority and reflected in consumer readiness.
Step 1. Propose the correction for the held payload.
not yet satisfied
Operates onQUAR-004Missing mandatory field · lot 4Quarantine item· NORTHBRIDGE-ALLOY / Sheffield Bar Mill
holdingarchivedcorrectionrejectedreleaseAuthorityblocked
Moves the record and writes evidence. Permission: remediate.
Acceptance for this step: correction = proposed
Step 2. Release under authority; the original payload is retained.
not yet satisfied
Operates onQUAR-011Duplicate key · lot 11Quarantine item· OPTIMON-IND / Halol Packaging Line
holdingreleasedcorrectionpendingreleaseAuthoritypending
Separation of duties: Integration Engineer may not do this. Act as
Acceptance for this step: holding = released, releaseAuthority = granted
Step 3. Re-evaluate the readiness condition the failure affected.
not yet satisfied
Operates onREAD-018Maintenance risk — input 18Readiness item· OPTIMON-IND / Nagda Warehouse
conditionmissingevidencemissingtrendstable
Moves the record and writes evidence. Permission: test.
Acceptance for this step: condition = satisfied, evidence = complete

Exception path

A dangerous or undesirable process value will not be deleted merely for exceeding a business threshold.
Alternate path. The correction is not defensible: reject it and retain the evidence.
not yet satisfied
Operates onQUAR-004Missing mandatory field · lot 4Quarantine item· NORTHBRIDGE-ALLOY / Sheffield Bar Mill
holdingarchivedcorrectionrejectedreleaseAuthorityblocked
Separation of duties: Integration Engineer may not do this. Act as
Acceptance for this step: correction = rejected, holding = held

Workflow as specified

CoreSync will preserve valid observations with their quality and specification context, allowing downstream quality or consequence services to interpret the deviation.

Evidence written in this session

Nothing run yet in this session. Record state shown above may already satisfy steps from the seeded fixture history.

Journeys that include it

Not part of a composite journey; exercised through its family views.