OptimonCoreSync Studio
IE
CS-CFG-009 · CFG Flow definitions, deployment and connector ecosystem · 171 of 192

Reuse a blueprint across tenants and sites

Integration Lead · Trigger: A proven integration pattern is needed elsewhere.

Simulated fixture data. Every record, receipt and timeline entry on this screen is demonstration material. It is never production evidence.

Acceptance

1 of 4 steps satisfied

Two deployments will share the approved template while remaining isolated and locally correct.

Run the remaining steps below. The result is read back from record state — nothing here is a toast.

Normal path

A configuration change is validated, approved and rolled out to the fleet with a rollback ready.
Step 1. Validate the changed definition.
not yet satisfied
Operates onFLOW-014NGD Event stream B14 → canonical flowFlow definition· OPTIMON-IND / Nagda Warehouse
definitiondraftdeploymentplannedruntimeHealthfailed
Moves the record and writes evidence. Permission: test.
Acceptance for this step: definition = approved
Step 2. Validate the package that carries the change.
satisfied
Operates onRELE-021Release 2026.09.21-21Release· OPTIMON-IND / Raigarh Melt Shop
validationverifiedapprovalapprovedrolloutreleased
Moves the record and writes evidence. Permission: test.
Acceptance for this step: validation = verified
Step 3. Approve the rollout.
not yet satisfied
Operates onRELE-028Release 2026.09.28-28Release· NORTHBRIDGE-ALLOY / Sheffield Bar Mill
validationpendingapprovalrejectedrolloutblocked
Separation of duties: Integration Engineer may not do this. Act as
Acceptance for this step: approval = approved
Step 4. Deploy to the target placement.
not yet satisfied
Operates onFLOW-007HAL Document library A7 → canonical flowFlow definition· OPTIMON-IND / Halol Packaging Line
definitionapproveddeploymentcanaryruntimeHealthdegraded
Separation of duties: Integration Engineer may not do this. Act as
Acceptance for this step: deployment = released

Exception path

Imported mappings will not retain another tenant's identities or secrets.
Alternate path. The canary degrades: roll back to the previous package.
satisfied
Operates onRELE-014Release 2026.09.14-14Release· OPTIMON-IND / Nagda Warehouse
validationfailedapprovalpendingrolloutplanned
Separation of duties: Integration Engineer may not do this. Act as
Acceptance for this step: rollout = planned

Workflow as specified

CoreSync will instantiate a reusable definition with controlled site parameters and mappings, preserving pack ownership and prohibiting ungoverned Core forks.

Evidence written in this session

Nothing run yet in this session. Record state shown above may already satisfy steps from the seeded fixture history.

Journeys that include it