CS-CFG-010 · CFG Flow definitions, deployment and connector ecosystem · 172 of 192

Distribute definitions to disconnected or air-gapped runtimes

Plant Platform Operator · Trigger: A site cannot receive ordinary online configuration updates.

Simulated fixture data. Every record, receipt and timeline entry on this screen is demonstration material. It is never production evidence.

Acceptance

1 of 4 steps satisfied

Offline import tests will demonstrate authenticity, dependency completeness and installed-state reconciliation.

Run the remaining steps below. The result is read back from record state — nothing here is a toast.

Normal path

A configuration change is validated, approved and rolled out to the fleet with a rollback ready.
Step 1. Validate the changed definition.
not yet satisfied
Operates onFLOW-006NGD File drop F6 → canonical flowFlow definition· OPTIMON-IND / Nagda Warehouse
definitiondraftdeploymentreleasedruntimeHealthhealthy
Moves the record and writes evidence. Permission: test.
Acceptance for this step: definition = approved
Step 2. Validate the package that carries the change.
satisfied
Operates onRELE-013Release 2026.09.13-13Release· OPTIMON-IND / Raigarh Melt Shop
validationverifiedapprovalapprovedrolloutblocked
Moves the record and writes evidence. Permission: test.
Acceptance for this step: validation = verified
Step 3. Approve the rollout.
not yet satisfied
Operates onRELE-020Release 2026.09.20-20Release· NORTHBRIDGE-ALLOY / Sheffield Bar Mill
validationpendingapprovalrejectedrolloutreleased
Separation of duties: Integration Engineer may not do this. Act as
Acceptance for this step: approval = approved
Step 4. Deploy to the target placement.
not yet satisfied
Operates onFLOW-027HAL Document library C27 → canonical flowFlow definition· OPTIMON-IND / Halol Packaging Line
definitionapproveddeploymentcanaryruntimeHealthdegraded
Separation of duties: Integration Engineer may not do this. Act as
Acceptance for this step: deployment = released

Exception path

An obsolete or tampered package will not override protected version and trust policy.
Alternate path. The canary degrades: roll back to the previous package.
not yet satisfied
Operates onRELE-006Release 2026.09.06-6Release· OPTIMON-IND / Nagda Warehouse
validationfailedapprovalpendingrolloutreleased
Separation of duties: Integration Engineer may not do this. Act as
Acceptance for this step: rollout = planned

Workflow as specified

CoreSync will package signed definitions, dependencies and trust information for approved offline import, verify validity locally and return installation evidence through the permitted path.

Evidence written in this session

Nothing run yet in this session. Record state shown above may already satisfy steps from the seeded fixture history.