OptimonCoreSync Studio
IE
CS-CFG-008 · CFG Flow definitions, deployment and connector ecosystem · 170 of 192

Qualify and deprecate connector package versions

Connector Certification Lead · Trigger: A package is submitted or its support status changes.

Simulated fixture data. Every record, receipt and timeline entry on this screen is demonstration material. It is never production evidence.

Acceptance

4 of 4 steps satisfied

Catalogue entries will expose the exact qualification scope and affected installed consumers.

Every step's expected record state is present. This is read back from the records, not asserted by the screen.

Normal path

A configuration change is validated, approved and rolled out to the fleet with a rollback ready.
Step 1. Validate the changed definition.
satisfied
Operates onFLOW-013RGH Application API A13 → canonical flowFlow definition· OPTIMON-IND / Raigarh Melt Shop
definitionapproveddeploymentreleasedruntimeHealthhealthy
Moves the record and writes evidence. Permission: test.
Acceptance for this step: definition = approved
Step 2. Validate the package that carries the change.
satisfied
Operates onRELE-023Release 2026.09.23-23Release· OPTIMON-IND / Halol Packaging Line
validationverifiedapprovalapprovedrolloutblocked
Moves the record and writes evidence. Permission: test.
Acceptance for this step: validation = verified
Step 3. Approve the rollout.
satisfied
Operates onRELE-023Release 2026.09.23-23Release· OPTIMON-IND / Halol Packaging Line
validationverifiedapprovalapprovedrolloutblocked
Separation of duties: Integration Engineer may not do this. Act as
Acceptance for this step: approval = approved
Step 4. Deploy to the target placement.
satisfied
Operates onFLOW-006NGD File drop F6 → canonical flowFlow definition· OPTIMON-IND / Nagda Warehouse
definitiondraftdeploymentreleasedruntimeHealthhealthy
Separation of duties: Integration Engineer may not do this. Act as
Acceptance for this step: deployment = released

Exception path

A generic provider badge will not imply every version or operation is qualified.
Alternate path. The canary degrades: roll back to the previous package.
not yet satisfied
Operates onRELE-023Release 2026.09.23-23Release· OPTIMON-IND / Halol Packaging Line
validationverifiedapprovalapprovedrolloutblocked
Separation of duties: Integration Engineer may not do this. Act as
Acceptance for this step: rollout = planned

Workflow as specified

CoreSync will register provenance, dependencies, signatures, supported environments, test evidence and deprecation policy for each package version.

Evidence written in this session

Nothing run yet in this session. Record state shown above may already satisfy steps from the seeded fixture history.

Journeys that include it