OptimonCoreSync Studio
IE
CS-OBS-004 · OBS Operations, lineage, data readiness and consumption · 158 of 192

Assess whether a use case has its required data

Data Consumer Owner · Trigger: An intelligence or workflow use case is activated or loses an input.

Simulated fixture data. Every record, receipt and timeline entry on this screen is demonstration material. It is never production evidence.

Acceptance

1 of 4 steps satisfied

A failed dependency will propagate to the affected use-case readiness view with its evidence.

Run the remaining steps below. The result is read back from record state — nothing here is a toast.

Normal path

A failure is seen at the failing stage, owned, remediated and closed with evidence.
Step 1. Inspect the run and identify the failing stage.
satisfied
executionsucceededadmissionpartialdeliverypartial
Moves the record and writes evidence. Permission: annotate.
Acceptance for this step: evidence entry written
Step 2. Assign the incident to an owner with its runbook.
not yet satisfied
Operates onINCI-008Schema drift detected — Halol Packaging LineIncident· NORTHBRIDGE-ALLOY / Sheffield Bar Mill
triageresolvedimpactunknownremediationcomplete
Moves the record and writes evidence. Permission: remediate.
Acceptance for this step: triage = in review
Step 3. Execute the permitted remediation.
not yet satisfied
Operates onINCI-015Delivery lag breach — Raigarh Melt ShopIncident· OPTIMON-IND / Halol Packaging Line
triagependingimpactdegradedremediationblocked
Moves the record and writes evidence. Permission: remediate.
Acceptance for this step: remediation = complete, triage = resolved
Step 4. Close the run with reconciliation evidence.
not yet satisfied
executionfailedadmissionpartialdeliveryaccepted
Separation of duties: Integration Engineer may not do this. Act as
Acceptance for this step: execution = succeeded

Exception path

Data readiness will not independently authorize a physical action or certify a business decision as safe.
Alternate path. Remediation is not permitted at this level: escalate to the release manager.
not yet satisfied
Operates onINCI-001Connection refused — Raigarh Melt ShopIncident· OPTIMON-IND / Raigarh Melt Shop
triageresolvedimpactdegradedremediationcomplete
Moves the record and writes evidence. Permission: annotate.
Acceptance for this step: impact = blocked

Workflow as specified

CoreSync will compare registered input contracts with availability, freshness, completeness, semantic binding and access evidence, reporting satisfied, degraded, missing and unknown inputs.

Evidence written in this session

Nothing run yet in this session. Record state shown above may already satisfy steps from the seeded fixture history.

Journeys that include it