OptimonCoreSync Studio
IE
CS-DB-004 · DB Database snapshots and change-data capture · 54 of 192

Preserve transaction grouping across records

Data Engineer · Trigger: Related row changes are committed together.

Simulated fixture data. Every record, receipt and timeline entry on this screen is demonstration material. It is never production evidence.

Acceptance

4 of 4 steps satisfied

A multi-row transaction will retain supported boundaries and incomplete groups will not be advertised as atomic.

Every step's expected record state is present. This is read back from the records, not asserted by the screen.

Normal path

A snapshot or change stream is captured, deployed and reconciled against the source of record.
Step 1. Validate the capture definition and its restart position.
satisfied
Operates onFLOW-019HAL Mobile capture A19 → canonical flowFlow definition· OPTIMON-IND / Halol Packaging Line
definitionapproveddeploymentplannedruntimeHealthfailed
Moves the record and writes evidence. Permission: test.
Acceptance for this step: definition = approved
Step 2. Deploy the capture to its placement.
satisfied
Operates onFLOW-026NGD File drop B26 → canonical flowFlow definition· OPTIMON-IND / Nagda Warehouse
definitiondraftdeploymentreleasedruntimeHealthhealthy
Separation of duties: Integration Engineer may not do this. Act as
Acceptance for this step: deployment = released
Step 3. Inspect the run ledger for the capture window.
satisfied
executionsucceededadmissioncompletedeliveryaccepted
Moves the record and writes evidence. Permission: annotate.
Acceptance for this step: evidence entry written
Step 4. Verify reconciliation against the database's own counts.
satisfied
Operates onRECO-012Reprocessing — NGD File drop F6 → canonical flowRecovery plan· NORTHBRIDGE-ALLOY / Sheffield Bar Mill
planplannedauthorityrejectedverificationverified
Separation of duties: Integration Engineer may not do this. Act as
Acceptance for this step: verification = verified

Exception path

Missing transaction metadata will remain an explicit limitation rather than an invented atomic group.
Alternate path. Capture position is lost: plan a bounded re-capture instead of a blind full reload.
not yet satisfied
planfailedauthorityapprovedverificationmissing
Separation of duties: Integration Engineer may not do this. Act as
Acceptance for this step: plan = planned

Workflow as specified

CoreSync will retain transaction identity and boundaries where the source supports them and expose group completeness to consuming contracts.

Evidence written in this session

Nothing run yet in this session. Record state shown above may already satisfy steps from the seeded fixture history.

Journeys that include it

Not part of a composite journey; exercised through its family views.