CS-SYN-005 · SYN Governed synchronization and action-boundary transport · 189 of 192
Correlate transport, provider and execution acknowledgements
Integration Operator · Trigger: A target acknowledges a dispatched command.
Simulated fixture data. Every record, receipt and timeline entry on this screen is demonstration material. It is never production evidence.
Acceptance
2 of 3 steps satisfiedA command timeline will expose each stage and any missing execution evidence.
Run the remaining steps below. The result is read back from record state — nothing here is a toast.
Normal path
An outbound action is permitted, staged under dual control and evidenced by a receipt — permit, transport and outcome kept apart.
Step 1. Record the synchronization permit. A permit is not a transport.
satisfiedpermitgrantedsynchronizationcurrentcommandEvidenceaccepted
Separation of duties: Integration Engineer may not do this. Act as
Acceptance for this step: permit = granted
Step 2. Stage the command under dual control.
not yet satisfiedpermitgrantedsynchronizationcurrentcommandEvidenceaccepted
Separation of duties: Integration Engineer may not do this. Act as
Acceptance for this step: commandEvidence = queued
Step 3. Verify the receipt chain; a receipt is not a real-world outcome.
satisfiedOperates onEVID-009Asset/Meter-EM11 · defect_count evidence 9Evidence chain· OPTIMON-IND / Raigarh Melt Shop
custodyverifiedcompletenesscompletematurityconformant
Moves the record and writes evidence. Permission: annotate.
Acceptance for this step: custody = verified
Exception path
A successful network response will not be reported as a completed physical action.
Alternate path. Authority is withdrawn: revoke the permit and hold every staged command.
not yet satisfiedpermitgrantedsynchronizationcurrentcommandEvidenceaccepted
Separation of duties: Integration Engineer may not do this. Act as
Acceptance for this step: permit = revoked, synchronization = blocked
Workflow as specified
CoreSync will correlate each acknowledgement to the command and its stage, preserving the distinction between receipt, acceptance, execution and verified completion.
Evidence written in this session
Nothing run yet in this session. Record state shown above may already satisfy steps from the seeded fixture history.
