OptimonCoreSync Studio
IE
CS-OT-005 · OT Industrial telemetry and equipment acquisition · 29 of 192

Capture counters, pulses and totalizers

OT Integration Engineer · Trigger: Production or resource consumption is represented by an accumulating value.

Simulated fixture data. Every record, receipt and timeline entry on this screen is demonstration material. It is never production evidence.

Acceptance

3 of 4 steps satisfied

A simulated reset and rollover will retain raw evidence and their declared interpretation.

Run the remaining steps below. The result is read back from record state — nothing here is a toast.

Normal path

Equipment telemetry is acquired by a deployed flow on a healthy runtime, with the run ledger inspected.
Step 1. Validate the flow definition including its recovery contract.
satisfied
Operates onFLOW-021RGH OT controller C21 → canonical flowFlow definition· OPTIMON-IND / Raigarh Melt Shop
definitionapproveddeploymentreleasedruntimeHealthhealthy
Moves the record and writes evidence. Permission: test.
Acceptance for this step: definition = approved
Step 2. Confirm the runtime that will execute it is reachable.
satisfied
Operates onRUNT-028SHF-edge-01Runtime· NORTHBRIDGE-ALLOY / Sheffield Bar Mill
connectivityhealthytrustrevokeddriftcurrent
Moves the record and writes evidence. Permission: test.
Acceptance for this step: connectivity = healthy
Step 3. Deploy the flow to its placement.
not yet satisfied
Operates onFLOW-007HAL Document library A7 → canonical flowFlow definition· OPTIMON-IND / Halol Packaging Line
definitionapproveddeploymentcanaryruntimeHealthdegraded
Separation of duties: Integration Engineer may not do this. Act as
Acceptance for this step: deployment = released
Step 4. Inspect the run: admitted, published and receipts compared.
satisfied
executionpartialadmissioncompletedeliverypartial
Moves the record and writes evidence. Permission: annotate.
Acceptance for this step: evidence entry written

Exception path

Counter decrease will not automatically become negative production or consumption.
Alternate path. Acquisition stalls: raise and assign the incident against the failing stage.
satisfied
Operates onINCI-026Schema drift detected — Halol Packaging LineIncident· OPTIMON-IND / Nagda Warehouse
triagein reviewimpactblockedremediationproposed
Moves the record and writes evidence. Permission: remediate.
Acceptance for this step: triage = in review

Workflow as specified

CoreSync will preserve raw counter readings, rollover limits, reset epochs and source status so downstream derivations can distinguish accumulation from reset.

Evidence written in this session

Nothing run yet in this session. Record state shown above may already satisfy steps from the seeded fixture history.

Journeys that include it