OptimonCoreSync Studio
IE
CS-DQ-004 · DQ Quality validation, drift and remediation · 124 of 192

Manage breaking and compatible schema drift

Integration Engineer · Trigger: A producer changes payload structure or semantics.

Simulated fixture data. Every record, receipt and timeline entry on this screen is demonstration material. It is never production evidence.

Acceptance

0 of 3 steps satisfied

Drift evidence will identify affected contracts and preserve unaffected flows.

Run the remaining steps below. The result is read back from record state — nothing here is a toast.

Normal path

A quality failure is held, corrected under authority and reflected in consumer readiness.
Step 1. Propose the correction for the held payload.
not yet satisfied
Operates onQUAR-006Unauthorised field · lot 6Quarantine item· OPTIMON-IND / Nagda Warehouse
holdingheldcorrectionacceptedreleaseAuthoritygranted
Moves the record and writes evidence. Permission: remediate.
Acceptance for this step: correction = proposed
Step 2. Release under authority; the original payload is retained.
not yet satisfied
Operates onQUAR-013Unit mismatch · lot 13Quarantine item· OPTIMON-IND / Raigarh Melt Shop
holdingheldcorrectionproposedreleaseAuthoritypending
Separation of duties: Integration Engineer may not do this. Act as
Acceptance for this step: holding = released, releaseAuthority = granted
Step 3. Re-evaluate the readiness condition the failure affected.
not yet satisfied
Operates onREAD-020Energy intelligence — input 20Readiness item· NORTHBRIDGE-ALLOY / Sheffield Bar Mill
conditionsatisfiedevidencepartialtrenddegraded
Moves the record and writes evidence. Permission: test.
Acceptance for this step: condition = satisfied, evidence = complete

Exception path

A new unit or field meaning will not be accepted merely because the primitive type is unchanged.
Alternate path. The correction is not defensible: reject it and retain the evidence.
not yet satisfied
Operates onQUAR-006Unauthorised field · lot 6Quarantine item· OPTIMON-IND / Nagda Warehouse
holdingheldcorrectionacceptedreleaseAuthoritygranted
Separation of duties: Integration Engineer may not do this. Act as
Acceptance for this step: correction = rejected, holding = held

Workflow as specified

CoreSync will compare schemas and semantic metadata, evaluate consumer compatibility and isolate only affected records or routes as policy permits.

Evidence written in this session

Nothing run yet in this session. Record state shown above may already satisfy steps from the seeded fixture history.

Journeys that include it