OptimonCoreSync Studio
IE
CS-DB-002 · DB Database snapshots and change-data capture · 52 of 192

Continue from snapshot into ongoing changes

Database Integrator · Trigger: Initial load must transition into live synchronization.

Simulated fixture data. Every record, receipt and timeline entry on this screen is demonstration material. It is never production evidence.

Acceptance

2 of 4 steps satisfied

Inserts, updates and deletes during initial loading will be accounted for in the final effective state.

Run the remaining steps below. The result is read back from record state — nothing here is a toast.

Normal path

A snapshot or change stream is captured, deployed and reconciled against the source of record.
Step 1. Validate the capture definition and its restart position.
satisfied
Operates onFLOW-017RGH Document library E17 → canonical flowFlow definition· OPTIMON-IND / Raigarh Melt Shop
definitionapproveddeploymentcanaryruntimeHealthdegraded
Moves the record and writes evidence. Permission: test.
Acceptance for this step: definition = approved
Step 2. Deploy the capture to its placement.
not yet satisfied
Operates onFLOW-024SHF Event stream F24 → canonical flowFlow definition· NORTHBRIDGE-ALLOY / Sheffield Bar Mill
definitionreviewdeploymentplannedruntimeHealthfailed
Separation of duties: Integration Engineer may not do this. Act as
Acceptance for this step: deployment = released
Step 3. Inspect the run ledger for the capture window.
satisfied
Operates onRUN-031HAL Application API C3 → canonical flow · run 20260930Flow run· OPTIMON-IND / Halol Packaging Line
executionsucceededadmissioncompletedeliveryaccepted
Moves the record and writes evidence. Permission: annotate.
Acceptance for this step: evidence entry written
Step 4. Verify reconciliation against the database's own counts.
not yet satisfied
planverifiedauthoritypendingverificationpartial
Separation of duties: Integration Engineer may not do this. Act as
Acceptance for this step: verification = verified

Exception path

Missing source logs or ambiguous boundaries will trigger a reconciliation or resnapshot decision.
Alternate path. Capture position is lost: plan a bounded re-capture instead of a blind full reload.
satisfied
planplannedauthorityapprovedverificationverified
Separation of duties: Integration Engineer may not do this. Act as
Acceptance for this step: plan = planned

Workflow as specified

CoreSync will coordinate the snapshot and change-stream boundary using supported offsets or watermarks, resolving overlap without creating an unobserved gap.

Evidence written in this session

Nothing run yet in this session. Record state shown above may already satisfy steps from the seeded fixture history.

Journeys that include it