OptimonCoreSync Studio
IE
CS-CFG-005 · CFG Flow definitions, deployment and connector ecosystem · 167 of 192

Roll out and roll back a changed integration

Platform Operator · Trigger: A connector or mapping release must replace a running version.

Simulated fixture data. Every record, receipt and timeline entry on this screen is demonstration material. It is never production evidence.

Acceptance

2 of 4 steps satisfied

A failed rollout will return to a supported state or expose the required recovery plan.

Run the remaining steps below. The result is read back from record state — nothing here is a toast.

Normal path

A configuration change is validated, approved and rolled out to the fleet with a rollback ready.
Step 1. Validate the changed definition.
not yet satisfied
Operates onFLOW-010NGD Partner SaaS D10 → canonical flowFlow definition· OPTIMON-IND / Nagda Warehouse
definitiondraftdeploymentblockedruntimeHealthhealthy
Moves the record and writes evidence. Permission: test.
Acceptance for this step: definition = approved
Step 2. Validate the package that carries the change.
satisfied
Operates onRELE-017Release 2026.09.17-17Release· OPTIMON-IND / Raigarh Melt Shop
validationverifiedapprovalapprovedrolloutcanary
Moves the record and writes evidence. Permission: test.
Acceptance for this step: validation = verified
Step 3. Approve the rollout.
not yet satisfied
Operates onRELE-024Release 2026.09.24-24Release· NORTHBRIDGE-ALLOY / Sheffield Bar Mill
validationpendingapprovalrejectedrolloutplanned
Separation of duties: Integration Engineer may not do this. Act as
Acceptance for this step: approval = approved
Step 4. Deploy to the target placement.
satisfied
Operates onFLOW-003HAL Application API C3 → canonical flowFlow definition· OPTIMON-IND / Halol Packaging Line
definitionapproveddeploymentreleasedruntimeHealthhealthy
Separation of duties: Integration Engineer may not do this. Act as
Acceptance for this step: deployment = released

Exception path

Rollback will not assume state compatibility after a breaking migration.
Alternate path. The canary degrades: roll back to the previous package.
not yet satisfied
Operates onRELE-010Release 2026.09.10-10Release· OPTIMON-IND / Nagda Warehouse
validationfailedapprovalpendingrolloutreleased
Separation of duties: Integration Engineer may not do this. Act as
Acceptance for this step: rollout = planned

Workflow as specified

CoreSync will perform preflight, staged activation, health checks and controlled rollback with compatible checkpoint and schema handling.

Evidence written in this session

Nothing run yet in this session. Record state shown above may already satisfy steps from the seeded fixture history.

Journeys that include it