OptimonCoreSync Studio
IE
CS-CFG-004 · CFG Flow definitions, deployment and connector ecosystem · 166 of 192

Promote configuration between environments

Release Engineer · Trigger: A tested flow moves from development to a site environment.

Simulated fixture data. Every record, receipt and timeline entry on this screen is demonstration material. It is never production evidence.

Acceptance

2 of 4 steps satisfied

Promotion evidence will show the common definition and the exact authorized overlay.

Run the remaining steps below. The result is read back from record state — nothing here is a toast.

Normal path

A configuration change is validated, approved and rolled out to the fleet with a rollback ready.
Step 1. Validate the changed definition.
satisfied
Operates onFLOW-009RGH Mobile capture C9 → canonical flowFlow definition· OPTIMON-IND / Raigarh Melt Shop
definitionapproveddeploymentplannedruntimeHealthfailed
Moves the record and writes evidence. Permission: test.
Acceptance for this step: definition = approved
Step 2. Validate the package that carries the change.
not yet satisfied
Operates onRELE-016Release 2026.09.16-16Release· NORTHBRIDGE-ALLOY / Sheffield Bar Mill
validationpendingapprovalrejectedrolloutreleased
Moves the record and writes evidence. Permission: test.
Acceptance for this step: validation = verified
Step 3. Approve the rollout.
satisfied
Operates onRELE-023Release 2026.09.23-23Release· OPTIMON-IND / Halol Packaging Line
validationverifiedapprovalapprovedrolloutblocked
Separation of duties: Integration Engineer may not do this. Act as
Acceptance for this step: approval = approved
Step 4. Deploy to the target placement.
not yet satisfied
Operates onFLOW-002NGD Historian B2 → canonical flowFlow definition· OPTIMON-IND / Nagda Warehouse
definitiondraftdeploymentcanaryruntimeHealthdegraded
Separation of duties: Integration Engineer may not do this. Act as
Acceptance for this step: deployment = released

Exception path

Environment changes will not silently alter protected semantics or bypass approval.
Alternate path. The canary degrades: roll back to the previous package.
satisfied
Operates onRELE-009Release 2026.09.09-9Release· OPTIMON-IND / Raigarh Melt Shop
validationverifiedapprovalapprovedrolloutplanned
Separation of duties: Integration Engineer may not do this. Act as
Acceptance for this step: rollout = planned

Workflow as specified

CoreSync will apply approved environment-specific bindings and secrets references without copying test identities, credentials or data into production.

Evidence written in this session

Nothing run yet in this session. Record state shown above may already satisfy steps from the seeded fixture history.

Journeys that include it