OptimonCoreSync Studio
IE
CS-CFG-002 · CFG Flow definitions, deployment and connector ecosystem · 164 of 192

Choose an approved execution location

Platform Engineer · Trigger: A flow can run at edge, plant or cloud.

Simulated fixture data. Every record, receipt and timeline entry on this screen is demonstration material. It is never production evidence.

Acceptance

3 of 4 steps satisfied

The effective placement will retain its policy decision and fail incompatible deployment tests.

Run the remaining steps below. The result is read back from record state — nothing here is a toast.

Normal path

A configuration change is validated, approved and rolled out to the fleet with a rollback ready.
Step 1. Validate the changed definition.
satisfied
Operates onFLOW-007HAL Document library A7 → canonical flowFlow definition· OPTIMON-IND / Halol Packaging Line
definitionapproveddeploymentcanaryruntimeHealthdegraded
Moves the record and writes evidence. Permission: test.
Acceptance for this step: definition = approved
Step 2. Validate the package that carries the change.
not yet satisfied
Operates onRELE-014Release 2026.09.14-14Release· OPTIMON-IND / Nagda Warehouse
validationfailedapprovalpendingrolloutplanned
Moves the record and writes evidence. Permission: test.
Acceptance for this step: validation = verified
Step 3. Approve the rollout.
satisfied
Operates onRELE-021Release 2026.09.21-21Release· OPTIMON-IND / Raigarh Melt Shop
validationverifiedapprovalapprovedrolloutreleased
Separation of duties: Integration Engineer may not do this. Act as
Acceptance for this step: approval = approved
Step 4. Deploy to the target placement.
satisfied
Operates onFLOW-028SHF Vision system D28 → canonical flowFlow definition· NORTHBRIDGE-ALLOY / Sheffield Bar Mill
definitionreviewdeploymentreleasedruntimeHealthhealthy
Separation of duties: Integration Engineer may not do this. Act as
Acceptance for this step: deployment = released

Exception path

Available compute will not override locality or protected operational constraints.
Alternate path. The canary degrades: roll back to the previous package.
not yet satisfied
Operates onRELE-007Release 2026.09.07-7Release· OPTIMON-IND / Halol Packaging Line
validationverifiedapprovalapprovedrolloutcanary
Separation of duties: Integration Engineer may not do this. Act as
Acceptance for this step: rollout = planned

Workflow as specified

CoreSync will evaluate connectivity, source protection, sovereignty, resource and dependency requirements and bind the flow to an approved runtime profile.

Evidence written in this session

Nothing run yet in this session. Record state shown above may already satisfy steps from the seeded fixture history.

Journeys that include it

Not part of a composite journey; exercised through its family views.